Floor protection
Plan the route through the building.
Explore temporary floor protection for trade traffic, moving routes and commercial fit-out. Select around the existing floor finish, site activity and project duration. Product supply and suitability require confirmation.
Add your project location
- 01
Floor finish
Identify timber, tile, vinyl, carpet or another surface, including any recently applied finish.
- 02
Site traffic
Describe pedestrian use, trolleys, moving activity and material handling.
- 03
Coverage
Provide area, route widths, thresholds and any stair requirements.
BUYER QUESTIONS
How do I choose floor protection?
Start with the substrate and finish, expected traffic and duration. Confirm compatibility and installation requirements for the selected covering.
What quantity information is useful?
Supply the area and a route plan. Include stairs and changes in floor level so quantities can be reviewed.
Does an image establish load or moisture performance?
No. Confirm any required performance against the selected product documentation before specifying it.